Watertight Subterranean Transport Hubs

Sydney Metro Luddenham Station

Overview

Sydney Metro Luddenham Station

As part of the major new transport hub at Luddenham Station, Danlaid Contracting Australia was engaged by Webuild to provide below-ground waterproofing. This infrastructure project required highly reliable concrete protection to safeguard subterranean trenches and support the Sydney Metro network. The works were essential for ensuring the long-term durability of the new station's foundation.

Project Gallery

The Challenge

What we were asked to solve

The primary challenge was supplying and successfully applying a robust below-ground PVC waterproofing membrane to nine deep subterranean trenches. Given the critical nature of transport infrastructure, these trenches required a flawless, watertight seal to prevent future water ingress, ground movement issues and long-term asset deterioration. Working in a complex, active construction environment meant precision and schedule adherence were absolutely paramount.

Our Approach

How we delivered

Danlaid approached the project by selecting and installing the Fatra FATRAFOL 911 T20 PVC waterproofing membrane, paired with a comprehensive injection system. Our experienced technicians worked methodically across the nine below-ground trenches, ensuring every application met strict compliance standards. We coordinated closely with Webuild to integrate our installation smoothly with the broader site operations and timelines.

The Solution

A flawless, durable outcome.

We delivered a completely watertight and highly durable below-ground protection system for the Luddenham Station trenches. The combination of the PVC membrane and injection system ensured long-term structural integrity for this vital transport hub. We executed the entire scope of work flawlessly, with zero issues reported during the installation. For your infrastructure projects, this means you can trust us to handle complex below-ground protection with zero fuss.

Key Outcomes

Results that matter to your project.

Applied Fatra FATRAFOL PVC membrane to nine below-ground trenches
Implemented a complete injection system
Executed project flawlessly and completed on time with no issues