Danlaid Contracting Australia partnered with Hansen Yuncken to deliver concrete protection for the UNSW Health Translation Hub in Randwick, NSW. This facility integrates health education, training and research with acute healthcare services. The project required extensive waterproofing and flooring solutions to support the building's critical healthcare functions, giving you an idea of our capability in demanding environments.

Project Gallery

The Challenge

What we were asked to solve

The client required external waterproofing and epoxy flooring across a complex 8,897 square metre footprint. The project spanned multiple critical areas including basement services, ground floor terraces, planter boxes, retaining walls, plant rooms and the roof level slab. Coordinating access and ensuring watertight integrity across these diverse healthcare environments presented a significant logistical challenge.

Our Approach

How we delivered

We tackled the project by deploying specialists capable of managing both the extensive waterproofing and the complex epoxy flooring requirements. We implemented strict project management and quality control processes to ensure every phase met compliance standards. By coordinating closely with the client, we navigated the site’s diverse work fronts while maintaining safety and operational efficiency.

The Solution

A flawless, durable outcome.

Danlaid delivered 8,897 square metres of external waterproofing and epoxy flooring across all required zones. The protective systems provided a durable, watertight and functional finish for an acute healthcare environment. We completed the project strictly on schedule in 2025, ensuring the facility was ready to serve the NSW community without delay. You’ll find we bring this same level of schedule confidence and risk reduction to your projects.

Key Outcomes

Results that matter to your project.

Delivered 8,897 sqm of external waterproofing and epoxy flooring
Protected basements, plant rooms and roof slabs
Completed project on time in 2025

Your Next Project

Bring this delivery confidence to your site.

Speak with our team about applying the same approach, capability and compliance to your project.

More Case Studies